Project History


Augustana Residential Tower

May 9, 2019
Augustana Residential Tower

Doublestar Drilling (DSD) was awarded the Augustana Residential Tower in fall of 2017.This Anchored Soldier Pile and Lagging Shoring System was located in Edmonton, AB. At a total excavation depth of 19m, this became DSD’s deepest Lagging System to date. Our piling crew were equipped with Doublestar’s Soilmec SR65 drill rig, to ensure the design […]

Read More...



Mosaic Potash Mine

May 2, 2019
Mosaic Potash Mine

In November of 2018, Doublestar Drilling (DSD) was awarded the K3 to K1 Conveyor System Project by PCL Construction. DSD was accountable for the supply and installation of 115ea CIP Concrete Foundation Piles that would support the continuation of Mosaic Potash Mine expansion. Our scope of work included 915mm diameter CIP Piles on the CN […]

Read More...



Mission Landing

May 2, 2019
Mission Landing

Doublestar Drilling (DSD) was awarded by Manshield Construction the Mission Landing CO-OP Project, in late March of 2018. DSD worked closely during the pre-construction and engineering stages of the permanent shoring system, to propose and design assist with an alternative solution that reduced overall costs, risk and schedule. The shoring system included the excavation support […]

Read More...



Spray Lakes Slide Repair

February 28, 2019
Spray Lakes Slide Repair

Doublestar Drilling (DSD) was awarded by Alberta Transportation the Spray Lakes Slide Repair Project, in late May of 2018 as Prime Contractor. Pre-project planning was critical to ensure all safety risk factors were discovered and to allow for a proper and timely execution of the design. Due to site constrictions, Doublestar Drilling was required to […]

Read More...



Douglasdale McKenzie Lake

February 28, 2019
Douglasdale McKenzie Lake

In November 2017, Pomerleau awarded Doublestar Drilling (DSD) the Douglasdale-McKenzie Lake Slope Stabilization & Pathway Project located in Calgary, Alberta, on the banks of the Bow River. Doublestar was responsible for supplying & installing 236ea CIP Concrete Piles, 234ea Rock Anchors, 225ea Micropiles, 800m2 of Shotcrete and the installation of geotechnical instruments; Slope Inclinometers & […]

Read More...