Client Scott Builders Location Edmonton, Alberta Date November 2021 – March 2022 Value 1M CFA Piles & Load Testing Double Star Drilling (DSD) was awarded the design, supply and installation scope of work for Continuous Flight Auger (CFA) piles and including a static pile load test, complete with monitoring, data collection and post load test […]
Client Shanghai Construction Group Location Edmonton, Alberta Date April 2020 – October 2021 Value 2.8M Shoring Double Star Drilling was contracted by Shanghai Construction Group to design, install and excavate two shafts to allow access for a tunnel boring machine (TBM) which is used in horizontal boring or trenchless construction methods. Project Details The DSD […]
Client PCL Construction Location Saskatoon, Saskatchewan Date June 2017 – October 2017 Value 3.3M Stone Columns Double Star Drilling (DSD) was awarded the City of Saskatoon Interchange Stone Columns Ground Improvement Project by PCL Construction. These required interchanges will help reduce the current high-volume traffic in these areas. Several alternatives were evaluated during project pursuit […]
Client PCL Location Lethbridge, Alberta Date June 2016 – August 2016 Value 2M Soldier Pile and Shotcrete with Tieback Anchors Shoring System Double Star Drilling (DSD) was awarded the temporary shoring scope of work for the University of Lethbridge Destination project (a new Science and Academic building). The temporary shoring system was a unique combination […]
Client Earthwise Construction Location Edmonton, Alberta Date July – August 2016 Value 1M Shoring Double Star Drilling (DSD) was contracted by Earthwise Construction to design, install and excavate a shaft, to provide access for a tunnel boring machine used for trenchless sewer construction methods. The most economical shoring design was to install a secant pile […]
Client Stuart Olson Location Calgary, Alberta Date September 2015 – December 2015 Value 1M Drilled CIP Piles Double Star Drilling was awarded the supply and installation of the Drilled CIP Pile scope of work for the New Central Library by Stuart Olson, which is located just east of City Hall in Calgary, AB. This was […]
Client Dawson Wallace Location Calgary, Alberta Date November 2014 – February 2015 Value 5.1M Piling In early 2014, Double Star Drilling (DSD) was awarded by Dawson Wallace the new Home Depot Distribution Centre in Calgary, AB. With the site being 650,000 square feet, this is the largest piling project Doublestar has been awarded. After looking […]
Client ITC Construction Group Location Edmonton, Alberta Date 2014 Value 2.8M Piling and Shoring When intricate work was required for the construction of the Mayfair 2 Tower in downtown Edmonton and adjacent to existing LRT tunnels, ITC Construction Group turned to Double Star Drilling. Under strict guidelines from the City of Edmonton’s Transportation and Infrastructure […]